• Latest
Togo, Niger, Benin Made No Payment For Electricity  Supplied To Them By Nigeria In 2nd Qtr – NERC

SCADA system: NERC gives all GenCos deadline to fully integrate operations

June 21, 2025
Mugabe’s Son Arraigned for Attempted Murder

Mugabe’s Son Arraigned for Attempted Murder

February 23, 2026
Bandits’ Negotiator, Tukur Mamu Arrested In Egypt

Mamu: Court Adjourns Fundamental Rights Suit Against AGF

February 23, 2026
Fire Breaks Out at Lagos Airport

Fire Breaks Out at Lagos Airport

February 23, 2026
Cartel Leader ‘El Mencho’, top Aides killed by Mexican Army

Four Football Matches Postponed After Cartel Leader’s Death

February 23, 2026
Anambra Govt Bans Public Display Of Casket, Keeping Corpse For Over 60days

Anambra Govt Shuts down New Auto Spare Parts Market

February 23, 2026
Chad Closes Border With Sudan

Chad Closes Border With Sudan

February 23, 2026
No Security Breech To Warrant Closure Of Schools- FCTA

FCTA Suspends Enforcement Of Drivers, Riders Permit Levy

February 23, 2026
Nigeria Wins $6.2m Arbitration battle against UK tech firm

Nigeria Wins $6.2m Arbitration battle against UK tech firm

February 23, 2026
Cartel Leader ‘El Mencho’, top Aides killed by Mexican Army

Cartel Leader ‘El Mencho’, top Aides killed by Mexican Army

February 23, 2026
  • About US
  • Advert Rates
  • Privacy Policy
  • Contact
Tuesday, February 24, 2026
  • Login
No Result
View All Result
Present Nigeria
  • Home
  • News
  • Politics
  • Business
  • Crime
  • Entertainment
  • Health
  • Lifestyle
  • Opinion
  • Education
  • Sports
  • World News
  • Home
  • News
  • Politics
  • Business
  • Crime
  • Entertainment
  • Health
  • Lifestyle
  • Opinion
  • Education
  • Sports
  • World News
No Result
View All Result
Present Nigeria
No Result
View All Result

SCADA system: NERC gives all GenCos deadline to fully integrate operations

by Present Nigeria
June 21, 2025
in Business
0
Togo, Niger, Benin Made No Payment For Electricity  Supplied To Them By Nigeria In 2nd Qtr – NERC
30
SHARES
59
VIEWS
FacebookTwitterWhatsappTelegram

The Nigerian Electricity Regulatory Commission (NERC) has issued a new directive requiring all grid-connected Power Generation Companies (GenCos) to fully integrate their operations with the National Supervisory Control and Data Acquisition (SCADA) system by Dec. 31.

The (SCADA)/Energy Management System (EMS) serves as the central nervous system of grid operations—enabling automated controls, real-time fault detection, and live monitoring of power generation output.

RelatedPosts

Mugabe’s Son Arraigned for Attempted Murder

Mamu: Court Adjourns Fundamental Rights Suit Against AGF

Fire Breaks Out at Lagos Airport

According to the Commission, GenCos that fail to comply with this directive will face significant financial penalties and possible disconnection from the national grid.

The directive is contained in a newly released regulatory framework titled: “Order on the Mandatory Integration of Grid-Connected Generating Units into the New SCADA/EMS for the Nigerian Electricity Supply Industry.”

The order was published on NERC’s website on Friday and took effect from May 22.

It was signed by NERC Chairman, Garba Sanusi, and Vice Chairman, Musiliu Oseni.

According to the commission, the integration shall include real-time data transmission of the following parameters: Active Power, Reactive Power, Frequency, Voltage, Status of Circuit breakers, and Fault alarms.

It also said that the document further provided many other details required from the Gencos and other operators in the sector.

According to the commission, the order seeks to strengthen real-time monitoring of the power grid, improve operational efficiency, enhance load dispatch, and reduce nationwide system disturbances by ensuring full visibility of electricity generation across the country.

”The national grid has in recent years experienced several collapses, often traced to inadequate coordination between generation, transmission and distribution assets.

‘Functional SCADA/EMS acts as the central nervous system of grid operations, enables automated controls, timely fault detection, and live monitoring of generation output.

”However, many GenCos are still not fully connected to this system, ”it said.

The commission said that the new order compelled power generators to install SCADA- compliant data acquisition devices, ensure compatibility with the TCN’s protocols and allow remote visibility by the Nigerian Independent System Operator.

”The order read, “Pursuant to Section 12.2 of the Grid Code for the Nigeria Electricity Transmission System (the “Grid Code” or the “Code”), all the generation companies are mandated to provide real-time operational data to the Nigerian Independent System Operator through the SCADA/EMS to facilitate effective grid management.

”Section 20.16 further requires the Gencos to ensure seamless communication and data exchange with the Transmission Company of Nigeria SCADA/EMS for accurate system monitoring, fault detection, and load dispatch.

”Section 20.16.1 of the Grid Code stipulates that SCADA Remote Terminal Units shall be required in all the control rooms of the System Operator and at the Off-taker’s boundary site and the generator’s control room for the transmission of signals and indications to and from the National Control Centre.” it said.

The commission also noted that Section 20.16.2 of the code further provided that interface cabinets shall be installed in the relevant control room, and the user shall provide and maintain wiring and signalling from the user’s plant and apparatus to the interface cabinet.

It said that the SCADA/EMS/System Telecommunications project being executed by the TCN had progressed substantially to a level that required the integration of the power generation units to have a complete functional and efficient SCADA/EMS for the NESI”

It said that the order aimed to, through the full integration of Gencos, enhance grid visibility and operational efficiency through real-time monitoring of grid operations to ensure compliance with the provisions of the Grid Code for the Nigerian Electricity Transmission System.

Share this:

  • Click to share on Facebook (Opens in new window)
  • Click to share on Twitter (Opens in new window)
  • Click to share on WhatsApp (Opens in new window)
  • Click to share on Telegram (Opens in new window)
  • Click to share on LinkedIn (Opens in new window)
  • Click to share on Pinterest (Opens in new window)

Related

Share12Tweet8SendShareShare2
Previous Post

Nigerian army deploys 197 troops to ECOWAS mission in Gambia

Next Post

Police reveal identity of lady found dead with her hands tied after lodging at Abuja hotel

Related Posts

NAFDAC Uncovers Warehouse with N3m Worth of Banned Products

NAFDAC Uncovers Warehouse with N3m Worth of Banned Products

February 23, 2026
NNPCL, Dangote Group Forge Strategic Alliance

NNPCL, Dangote Group Forge Strategic Alliance

February 21, 2026
NAFDAC Seals 18 Warehouses in Niger

NAFDAC Seals 18 Warehouses in Niger

February 21, 2026
PENGASSAN Faults Tinubu’s Executive Order on Oil Revenue

PENGASSAN Faults Tinubu’s Executive Order on Oil Revenue

February 20, 2026
Next Post
Four bank staff in police net for alleged money laundering,  N270m fraud

Police reveal identity of lady found dead with her hands tied after lodging at Abuja hotel

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

RECOMMENDED

Mugabe’s Son Arraigned for Attempted Murder

Mugabe’s Son Arraigned for Attempted Murder

February 23, 2026
Bandits’ Negotiator, Tukur Mamu Arrested In Egypt

Mamu: Court Adjourns Fundamental Rights Suit Against AGF

February 23, 2026
Fire Breaks Out at Lagos Airport

Fire Breaks Out at Lagos Airport

February 23, 2026
Cartel Leader ‘El Mencho’, top Aides killed by Mexican Army

Four Football Matches Postponed After Cartel Leader’s Death

February 23, 2026
  • BROKEN PROMISES: The Untold Story Of PHCN Privatization, Betrayed Workers & The Jettisoned Labour Agreement

    BROKEN PROMISES: The Untold Story Of PHCN Privatization, Betrayed Workers & The Jettisoned Labour Agreement

    199 shares
    Share 80 Tweet 50
  • PENSION ALERT FOR ALL WORKERS: A Call to Rescue Our Future from Exploitation

    174 shares
    Share 70 Tweet 44
  • Troops neutralise second-in-command to notorious bandit leader in Kogi

    146 shares
    Share 58 Tweet 37
  • The Great Betrayal Of Ex-PHCN Workers

    140 shares
    Share 56 Tweet 35
  • Yoruba Actor and Father to Skitmaker Isbae U, Sir Kay is Dead

    116 shares
    Share 46 Tweet 29

PRESENT, a credible online newspaper from the cell of Red Carpet Communications Limited, is published by an experienced and profoundly resourceful journalist, Yemi Olowolabi.
It leads in lucid presentation of trending stories and breaking news in Politics, Business, Economy, Entertainment, Sports, Lifestyles and Other Features.
With a heritage of in-depth coverage and adept leverage of core professionals, PRESENT is the trusted witness of the news.

Recent News

Mugabe’s Son Arraigned for Attempted Murder

Mugabe’s Son Arraigned for Attempted Murder

February 23, 2026
Bandits’ Negotiator, Tukur Mamu Arrested In Egypt

Mamu: Court Adjourns Fundamental Rights Suit Against AGF

February 23, 2026
Fire Breaks Out at Lagos Airport

Fire Breaks Out at Lagos Airport

February 23, 2026
  • Home
  • News
  • Politics
  • Business
  • Crime
  • Entertainment
  • Health
  • Lifestyle
  • Opinion
  • Education
  • Sports
  • World News

© 2025 Present Nigeria. All Rights Reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
  • Politics
  • Business
  • Crime
  • Entertainment
  • Health
  • Lifestyle
  • Opinion
  • Education
  • Sports
  • World News

© 2025 Present Nigeria. All Rights Reserved.